- Home
- Drywall installers
- Fort Collins-Loveland, CO
Drywall installers / CO / BLS May 2025
Drywall installer wages in Fort Collins-Loveland, CO
BLS puts the middle of the drywall installer pay ladder in Fort Collins-Loveland, CO at $29.39 an hour (May 2025). A quarter of the trade earns under $22.05 and a quarter earns over $31.45. That median is 1% below the Colorado figure of $29.70 and 4% above the national $28.33, which puts the metro 50th of 169 for this trade.
A customer in Fort Collins pays none of those figures; our working further down turns the median into an implied billed hour of about $50.01 to $60.31, and says exactly which published loadings got it there.
01The wage table
| Hourly wage | Fort Collins | Colorado | U.S. |
|---|---|---|---|
| 10th percentile | $20.43 | $21.40 | $18.49 |
| 25th percentile | $22.05 | $23.43 | $22.81 |
| Median (50th) | $29.39 | $29.70 | $28.33 |
| 75th percentile | $31.45 | $33.77 | $35.69 |
| 90th percentile | $35.30 | $38.20 | $49.04 |
| Mean | $28.83 | $29.78 | $30.58 |
| Median, annual (hourly x 2,080) | $61,120 | $61,780 | $58,930 |
| Employment | 120 | 1,560 | 83,080 |
02How Fort Collins compares
The Fort Collins median of $29.39 falls between the Colorado 25th percentile ($23.43) and the state median ($29.70), $0.31 an hour short of the statewide midpoint. The metro holds about 8% of the state's 1,560 drywall and ceiling tile installers on BLS's count.
Top-tenth pay starts at $35.30 and bottom-tenth pay ends at $20.43: a gap of $14.87 an hour, or a multiple of 1.73 where the national multiple for the trade is 2.65, so Fort Collins pay is spread tighter than the U.S. pattern.
Across every occupation in Fort Collins the median wage is $26.59. The median drywall installer at $29.39 is 11% ahead of that; nationally the trade runs +16% against the all-occupation median of $24.51, so Fort Collins drywall and ceiling tile installers hold a smaller edge than the trade does countrywide.
BLS counts about 120 drywall and ceiling tile installers on payrolls in the metro, 0.69 for every 1,000 jobs. The location quotient is 1.28: the trade is 28% more concentrated in Fort Collins than in the national workforce. The headcount carries a relative standard error of 14.5%, ordinary for a count of 120.
The mean wage is $28.83, $0.56 below the median, with a relative standard error of 5.8%. Mean and median within $0.56 of each other say the Fort Collins ladder is fairly even on both sides.
| Rank | Metro | Median / hr | vs U.S. |
|---|---|---|---|
| 47 | Chico, CA | $29.52 | +4% |
| 48 | Philadelphia-Camden-Wilmington, PA-NJ-DE-MD | $29.46 | +4% |
| 49 | Indianapolis-Carmel-Greenwood, IN | $29.45 | +4% |
| 50 | Fort Collins-Loveland, CO | $29.39 | +4% |
| 51 | Yuba City, CA | $29.31 | +3% |
| 52 | Milwaukee-Waukesha, WI | $29.23 | +3% |
| 53 | Pittsburgh, PA | $29.14 | +3% |
Full drywall installer table for all 169 metros, where Fort Collins sits at rank 50.
03What that implies for a billed hour
| Line | 25th pct | Median | 75th pct |
|---|---|---|---|
| Hourly wage (BLS, May 2025) | $22.05 | $29.39 | $31.45 |
| Add benefits and required employer costs: 43.8% of wage (BLS ECEC, construction industry, June 2026) | $9.67 | $12.89 | $13.79 |
| Loaded labor cost per paid hour | $31.72 | $42.28 | $45.24 |
| Implied billed hour at a 15.5% gross margin (large public contractors) | $37.52 | $50.01 | $53.51 |
| Implied billed hour at a 29.9% gross margin (residential remodelers, FY2024) | $45.25 | $60.31 | $64.53 |
| What if 1 paid hour in 5 is never billed? Same 29.9% line, divided by 0.8 | $56.56 | $75.38 | $80.67 |
Take the median. $29.39 in wages plus $12.89 in benefits and required employer costs is $42.28 per paid hour. A contractor running the 29.9% gross margin that remodelers reported to NAHB has to bill $42.28 divided by 0.701, which is $60.31: 2.05 times the wage. The spread between the 25th and 75th percentile columns on that line is $19.29 an hour, so who is sent to your job moves the number as much as which firm you call.
One piece of the loading that is set for Colorado as a whole, not for Fort Collins, is workers compensation: in the Oregon DCBS 2024 comparison of all states, Colorado had a premium index rate of 1.05, 96% of the study median, ranking 28th most expensive of 51. At 96% of the median, the national ratio is a fair stand-in for Fort Collins, bearing in mind the index prices one fixed mix of industries and not drywall and ceiling tile installers alone.
The last line of the table is a what-if: if one paid hour in five is never billed, the $60.31 median figure becomes $75.38. We print no statistic for unbilled time in Fort Collins or anywhere else because we found no public one.
04Questions the numbers answer
Why would a contractor in Fort Collins bill far more than $29.39 an hour?
Because $29.39 is only the first line: BLS employer cost data put benefits and required costs at 43.8% on top of wages, which takes it to $42.28. Trucks, insurance, the office and profit come out of gross margin, and at published margins of 15.5% to 29.9% that implies $50.01 to $60.31 per billed hour in Fort Collins, more once unbilled time is counted.
Does a drywall installer in Fort Collins out-earn the typical local worker?
Yes: the all-occupation median wage in Fort Collins is $26.59 and the drywall installer median is $29.39, a difference of $2.80 an hour. Even the trade's 25th percentile, $22.05, is below the local all-occupation median.
What do the best-paid drywall and ceiling tile installers in Fort Collins earn?
BLS does not sort wages by experience or license class, so the upper percentiles are the nearest stand-in: $31.45 an hour at the 75th and $35.30 at the 90th in Fort Collins. Over a 2,080 hour year those come to $65,416 and $73,424 before any overtime premium.
05Other trades in Fort Collins
Drywall installers rank 3rd by median among the 9 trades with published wages in Fort Collins. Compare every trade in Fort Collins-Loveland, CO.
| Trade | 25th | Median | 75th | vs this trade |
|---|---|---|---|---|
| HVAC mechanics | $28.67 | $31.87 | $50.05 | +8% |
| Electricians | $23.52 | $29.52 | $36.33 | 0% |
| Drywall installers | $22.05 | $29.39 | $31.45 | |
| Plumbers | $23.26 | $29.14 | $36.75 | -1% |
| Concrete finishers | $23.15 | $28.31 | $30.36 | -4% |
| Carpenters | $23.36 | $28.04 | $30.74 | -5% |
| Painters | $21.88 | $23.51 | $27.93 | -20% |
| Roofers | $22.32 | $23.37 | $28.83 | -20% |
| Landscaping workers | $18.59 | $21.33 | $22.63 | -27% |
06Drywall installer wages across Colorado metros
| Metro | Median / hr | U.S. rank of 169 |
|---|---|---|
| Denver-Aurora-Centennial, CO | $30.89 | 25 |
| Fort Collins-Loveland, CO | $29.39 | 50 |
| Greeley, CO | $28.76 | 61 |
| Colorado Springs, CO | $27.44 | 72 |
| Grand Junction, CO | $25.64 | 87 |
Job guides that use drywall installer labor
Sources
- BLS Occupational Employment and Wage Statistics, May 2025 metropolitan, state and national files
- BLS Employer Costs for Employee Compensation, June 2026, Table 4 (private industry by occupational and industry group)
- NAHB Eye on Housing, Remodelers Saw Profit Margin Gains in 2024 (Remodelers' Cost of Doing Business Study)
- Aswath Damodaran, NYU Stern, Margins by Sector (US), data as of January 2026
- Oregon Department of Consumer and Business Services, workers' compensation premium rate ranking by state, 2024