- Home
- Job guides
Job guides
What specific jobs cost, and why
20 guides to common home-service jobs. Each one covers what drives the cost, how to reason about labor hours, permit fee lines read from real city schedules, and how to compare quotes. Where we could not open a source for a number, there is no number.
You will not find a made-up price range on these pages. You will find the national wage for the trade doing the work, the arithmetic that turns it into an implied billed hour, and fee lines copied from schedules published by Portland, San Francisco, Reno and Grand Rapids, with links.
- Bathroom remodelA bathroom remodel stacks plumbing, electrical, drywall, tile and paint in one small room. Wage arithmetic for each trade and real permit fee lines.
- Building a deckDeck cost drivers: height, footings, decking material, stairs and rails. Carpenter wage arithmetic, lumber price trends and a real deck permit line.
- Central air conditioner replacementWhat moves the price of a central AC replacement: matched coils, line sets, refrigerant rules and electrical. HVAC wages and permit lines included.
- Concrete drivewayConcrete driveway cost drivers: demolition, base prep, thickness, access for the truck and finish. Concrete finisher wages and ready-mix price trends.
- Drywall hanging and finishingDrywall cost is set by finish level, ceilings and how broken-up the space is. BLS wages for drywall installers and gypsum price trends included.
- EV charger installationHome EV charger installation cost comes down to circuit length and panel capacity. Electrician wage arithmetic, copper prices and real permit lines.
- Electrical panel upgradeWhat drives the cost of an electrical service or panel upgrade: labor arithmetic from BLS wages, real permit fee lines, and how to compare quotes.
- Exterior paintingExterior house painting cost drivers: scraping and prep, stories, siding type and lead-safe rules for pre-1978 homes, with painter wage arithmetic.
- Furnace replacementFurnace replacement cost drivers: equipment tier, venting, duct fixes and permits. HVAC wage arithmetic from BLS and fee lines from four cities.
- Gas line installationGas line cost drivers: run length, pipe sizing, route and pressure testing. Plumber wage arithmetic and gas piping permit lines from three cities.
- Heat pump water heater installationA heat pump water heater costs more to install than a standard tank because of electrical, condensate and space needs. Wages and permit lines included.
- Interior paintingInterior painting is mostly labor. How prep, height and trim drive hours, what BLS says painters earn, paint price trends and the lead-paint rule.
- Lawn sprinkler system installationLawn irrigation cost drivers: zone count, water supply, soil and backflow rules. Landscaping worker wages from BLS and permit lines from three cities.
- Mini-split installationMini-split installation cost drivers: zones, line set runs, electrical work and permits, with HVAC and electrician wage arithmetic and real fee lines.
- Roof replacementWhy roof replacement bids vary: size, pitch, tear-off, decking and safety rules. Roofer wages from BLS, shingle price trends and re-roof permit fees.
- Sewer line replacementSewer lateral replacement cost drivers: depth, length, what sits on top of the pipe, and method. Plumber wages and permit lines from city schedules.
- Tile shower installationA tiled shower's cost sits in waterproofing and layout labor, not tile. Tile setter and plumber wages, plus shower pan permit lines from city schedules.
- Water heater replacementWater heater replacement costs broken into labor, the tank, code items and the permit, with fee lines from four city schedules and BLS plumber wages.
- Whole-house repipeRepipe cost drivers: fixture count, stories, access and wall repair. Plumber wage arithmetic, pipe price trends and real permit fee lines.
- Whole-house rewireWhat drives the cost of rewiring an old house: wall access, circuit count, patching and the service. Electrician wage arithmetic and permit lines.
How to use a guide with a quote in your hand
Ask the contractor how many worker-days the bid assumes. Multiply by the one-worker-day figure in the guide's labor table, adjusted for your metro from the trade pages. Add the materials on the bid and the permit. If the total lands far from the quote, you have a specific question to ask instead of a vague feeling, and the answer is often reasonable: access, disposal, a second trade, a warranty that costs money to honor.
The Federal Trade Commission's advice on estimates is worth following to the letter: get more than one, in writing, with the work, materials, completion date and price spelled out, and ask for an explanation when bids differ a lot. See the FTC's home improvement guidance.