Job guide / carpenter, concrete finisher

What a deck costs to build, from footings up

A deck's cost is set by its height off the ground, its decking material and how much stair and railing it needs, more than by its square footage. Carpenters earn a national median of $29.12 an hour. Softwood lumber is 10.6% higher at the producer level than a year ago, and Grand Rapids charges a flat $66.00 plus zoning permit fee for a residential deck permit.

Low and simple, or tall and complicated

A platform a step above the lawn needs short posts or none, often no guardrail, and one or two steps. Raise the same platform to a second-story door and nearly everything changes: deeper and larger footings, taller posts with bracing, a ledger connection to the house that has to be flashed and bolted correctly, a full guardrail all the way round, and a long stair with a landing. The deck surface is the same size. The labor is not remotely the same.

So when you sketch what you want, note the height at the door. It is the first thing a builder will ask.

The parts of the bid

Footings. Holes dug below frost depth where frost applies, concrete placed, hardware set. Rocky or wet ground slows this. Call for a utility locate before digging; 811 is the free national service and wants a few business days.

Frame. Pressure-treated lumber in almost every case. Beam and joist sizes come from span tables, and an inspector will check them.

Decking. Treated pine is the low-cost surface. Cedar, tropical hardwood and composite or PVC boards cost more to buy, and hidden-fastener systems cost more to install. Diagonal or picture-frame patterns add cuts and waste.

Stairs and rails. Slow, fiddly, and heavily regulated because they are where people get hurt. A deck with a lot of perimeter and a long stair can have more labor in the railing than in the floor.

Extras. Skirting, lighting, a roof or pergola, built-in seating.

Carpenters, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the carpenter pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$23.32$33.54$39.68$47.85$383
Median$29.12$41.89$49.55$59.75$478
75th percentile$36.94$53.14$62.85$75.80$606

See carpenter wages for every metro.

Concrete finishers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the concrete finisher pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$22.60$32.51$38.45$46.37$371
Median$27.41$39.43$46.64$56.24$450
75th percentile$32.15$46.25$54.70$65.97$528

See concrete finisher wages for every metro.

Lumber

Producer prices for the main materials on this job. Latest index level for each series, with the change over 12 months and since January 2020. Each row uses the latest month that has a year-earlier reading. (p) marks a preliminary PPI figure; BLS revises indexes for up to four months after first publication. Source: BLS.
SeriesBLS series IDMonthIndex12 monthsSince Jan 2020
Softwood lumberWPU0811October 2026 (p)277.6+10.6%+25.5%
PlywoodWPU083October 2026 (p)312.4+16.9%+60.4%
CPI-U, all items, U.S. city averageCUUR0000SA0September 2026336.9+3.7%+30.6%

Lumber is the most volatile material on this site. A bid is often good for a limited period for that reason, and a builder who will not hold a price for months is being honest, not difficult.

Permit lines

Permit fee lines read from each city's published schedule in November 2026. Lines stack: an application or minimum fee usually sits under the item fee, and plan review, state surcharges and re-inspections come on top. Check your own city.
CityLine on the scheduleFeeSchedule
Grand Rapids, MIResidential deck, flat fee$66.00 plus zoning permit feePlanning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIBuilding permit base fee, first $1,000 of construction cost$54.00 plus zoning permit feePlanning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Portland, ORBuilding permit, work valued $2,001 to $25,000: fee for the first $2,000$220.85Building and Other Permits Fee Schedule, effective July 10, 2026
Portland, ORBuilding permit, each additional $1,000 of value up to $25,000$13.91Building and Other Permits Fee Schedule, effective July 10, 2026

Grand Rapids's flat deck fee applies under the Michigan Residential Code and its schedule notes that two inspections are included. Cities without a flat line use valuation, as in Portland's table. Expect to submit a drawing showing footings, spans and the ledger attachment.

Comparing bids

Same footprint and height on each. Then: footing count and size, lumber grade, decking brand and line, fastener type, rail system, stair width and landing, permit and drawings included, and who handles the inspection visits.

Why does my small, tall deck cost more than my neighbor's big, low one?

Height. Footings, posts, bracing, guardrail and stairs scale with elevation, and they are the labor-heavy parts.

Is a deck permit expensive?

On the schedules we read it is minor: $66.00 plus zoning permit fee in Grand Rapids. Where fees follow valuation, a job between $2,001 and $25,000 in Portland pays $220.85 for the first $2,000 and $13.91 per additional $1,000.