What a concrete driveway costs: the pour is the easy day
A driveway bid is concrete volume plus the labor to prepare for it, place it and finish it before it sets. Ready-mix concrete is 40.2% higher at the producer level than in January 2020, which is a large move on the biggest material line. Cement masons and concrete finishers earn a national median of $27.41 an hour, implying $46.64 to $56.24 per billed hour.
Volume first
Concrete is ordered by the cubic yard: length times width times thickness. The thickness is a design choice with a real price attached, since a thicker slab uses proportionally more concrete over the same area. Ask each bidder what thickness they priced and what reinforcement, because two bids for "a driveway" can differ widely in material before anyone has lifted a tool.
The work nobody photographs
Most of a driveway job happens before the truck arrives.
- Removal. Breaking out and hauling an old slab. Disposal is by weight and distance to the dump.
- Excavation and base. Soft or organic soil comes out. Compacted gravel goes in. This is what stops the slab from settling and cracking, and it is the first thing a low bid thins out.
- Forms and grade. Setting edges so water runs away from the garage and the house.
- Reinforcement. Mesh or bar, held up off the base so it ends up inside the slab instead of under it.
Then the pour. Concrete does not wait. Once the truck starts discharging, the crew has a fixed window to place, screed, float, edge, joint and broom the surface, and that window shrinks in heat and wind. That is why flatwork crews are sized to the pour and why a contractor cannot do your job with one person to save you money. If the truck cannot reach the forms, a pump or wheelbarrows are needed, and both cost.
Finish and extras
A broom finish is standard. Exposed aggregate, color and stamping add materials, time and skill, and they raise the stakes, since a decorative slab cannot be patched invisibly. Control joints are cut or tooled to tell the slab where to crack. Sealing and curing compound are small lines worth having.
| National wage point | Wage / hr | Loaded / hr | Implied billed hr, 15.5% margin | Implied billed hr, 29.9% margin | One worker-day (8 hr) at 29.9% |
|---|---|---|---|---|---|
| 25th percentile | $22.60 | $32.51 | $38.45 | $46.37 | $371 |
| Median | $27.41 | $39.43 | $46.64 | $56.24 | $450 |
| 75th percentile | $32.15 | $46.25 | $54.70 | $65.97 | $528 |
See concrete finisher wages for every metro.
Concrete prices
| Series | BLS series ID | Month | Index | 12 months | Since Jan 2020 |
|---|---|---|---|---|---|
| Ready-mix concrete | WPU1333 | October 2026 (p) | 394.8 | +2.4% | +40.2% |
| Concrete products | WPU133 | October 2026 (p) | 410.2 | +4.1% | +48.4% |
| CPI-U, all items, U.S. city average | CUUR0000SA0 | September 2026 | 336.9 | +3.7% | +30.6% |
Permits
Rules vary a great deal. Many cities require a permit for the driveway apron and curb cut because they sit in the public right of way, and that permit comes from the streets or engineering office, not the building department. Where a building permit applies, valuation schedules like Grand Rapids's work from the contract price:
| City | Line on the schedule | Fee | Schedule |
|---|---|---|---|
| Grand Rapids, MI | Building permit base fee, first $1,000 of construction cost | $54.00 plus zoning permit fee | Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026 |
| Grand Rapids, MI | Building permit incremental fee, each additional $1,000 of construction cost | $6.80 | Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026 |
Any excavation should be preceded by a utility locate. 811 is free and wants a few business days of notice.
Comparing bids
Thickness. Base depth and material. Reinforcement. Concrete strength specified on the ticket. Joint spacing. Finish. Removal and disposal included. Who repairs the lawn edge. Get those in writing and the totals will make sense.
Why does the crew size look large for one day?
Because finishing has to happen across the whole slab at once, inside the time the concrete allows. A short-handed pour ends with a poor surface that cannot be fixed afterwards.
How much have concrete prices moved?
The BLS producer price index for ready-mix concrete is 2.4% higher than a year ago and 40.2% higher than in January 2020. Consumer prices overall rose less over the same span, as the CPI row in the table shows.
Related guides
Sources
- BLS Occupational Employment and Wage Statistics, May 2025 metropolitan, state and national files
- BLS Employer Costs for Employee Compensation, June 2026, Table 4 (private industry by occupational and industry group)
- NAHB Eye on Housing, Remodelers Saw Profit Margin Gains in 2024 (Remodelers' Cost of Doing Business Study)
- Aswath Damodaran, NYU Stern, Margins by Sector (US), data as of January 2026
- BLS Producer Price Index commodity data and CPI-U, retrieved through the BLS public data API
- Grand Rapids, MI: Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
- 811 is free