COSTOF THEJOB
  1. Home
  2. Job guides
  3. Sewer line replacement

Job guide / plumber, concrete finisher

Sewer line replacement: what you are really paying for

With a sewer lateral you pay for digging, or for the equipment that avoids digging, far more than for pipe. Length, depth and whatever is on top of the line (lawn, driveway, a street) decide the bid. Permit lines we read: $90.00 flat in Reno, $180.00 for the first 100 feet in Portland, $290 in San Francisco's single-unit category. Plumbers earn a national median of $30.67 an hour.

Get the video before the bids

No one can price a sewer line they have not seen. A camera inspection with a locator tells you where the line runs, how deep it is, what it is made of, and whether the damage is one spot or the whole length. Pay for the video once, own the recording, and hand the same footage to every bidder. Otherwise you are comparing guesses.

The four things that set the price

1. Length, from the house to the connection point. Find out where your responsibility ends; in many cities the owner owns the lateral all the way to the main, including the part under the street. 2. Depth. A shallow line is a trench a small excavator digs in hours. A deep one needs shoring to keep the trench from collapsing on the crew, and shoring is slow. 3. Surface. Lawn gets reseeded. A driveway gets sawcut and repoured, which brings in a concrete finisher. Work in the public street brings traffic control, a right-of-way permit and pavement restoration to the city's standard. 4. Method. Open trench replaces everything and disturbs everything. Pipe bursting pulls a new line through the old one from two pits. Lining cures a new pipe inside the old. The trenchless methods trade excavation labor for specialized equipment and are not possible on every line; a collapsed or badly bellied pipe may rule them out.

Labor and the second trade

Plumbers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the plumber pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$24.13$34.71$41.06$49.51$396
Median$30.67$44.12$52.18$62.93$503
75th percentile$40.92$58.86$69.62$83.97$672

See plumber wages for every metro.

Concrete finishers, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the concrete finisher pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$22.60$32.51$38.45$46.37$371
Median$27.41$39.43$46.64$56.24$450
75th percentile$32.15$46.25$54.70$65.97$528

See concrete finisher wages for every metro.

Excavation crews often include laborers and an operator who are not plumbers, so the plumber wage is a ceiling for some of the hours and a floor for none. Ask the bidder how the crew is made up.

Permit lines

Permit fee lines read from each city's published schedule in November 2026. Lines stack: an application or minimum fee usually sits under the item fee, and plan review, state surcharges and re-inspections come on top. Check your own city.
CityLine on the scheduleFeeSchedule
Reno, NVResidential EZ permit: sewer line replacement$90.00EZ Permits and Miscellaneous Fees, effective July 1, 2026
Portland, ORSanitary sewer, first 100 feet$180.00Plumbing Permit Fee Schedule, effective July 10, 2026
Portland, ORExterior lines, each additional 100 feet or portion$137.00Plumbing Permit Fee Schedule, effective July 10, 2026
San Francisco, CACategory 1P, single residential unit: water service, sewer replacement, single plumbing fixture, shower pan, or a single kitchen or bathroom remodel (maximum two inspections)$290Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, effective July 12, 2026

Portland's fee covers the first 100 feet and adds $137.00 for each further 100. Street work, where it applies, is permitted separately by whoever owns the street.

Before anything is dug, the contractor has to have utilities located. Contact 811 a few business days before digging; the service is free. Confirm on the bid that the contractor makes that request.

Materials

Producer prices for the main materials on this job. Latest index level for each series, with the change over 12 months and since January 2020. Each row uses the latest month that has a year-earlier reading. (p) marks a preliminary PPI figure; BLS revises indexes for up to four months after first publication. Source: BLS.
SeriesBLS series IDMonthIndex12 monthsSince Jan 2020
Plastics pipeWPU07210603October 2026 (p)178.9+3.8%+66.5%
Ready-mix concreteWPU1333October 2026 (p)394.8+2.4%+40.2%
CPI-U, all items, U.S. city averageCUUR0000SA0September 2026336.9+3.7%+30.6%

Comparing bids

Same footage, same length, same endpoints. Check that each bid says who restores the surface and to what standard, who pays if rock or groundwater turns up, and whether the price includes the final camera pass after the new line is in. Follow the FTC's general advice too: get multiple written estimates and ask for an explanation if there is a big difference among them.

Is trenchless always cheaper?

No. It saves surface restoration, so it wins under driveways, mature trees and streets. Across an open lawn with a shallow line, a trench can cost less.

What does the sewer permit cover?

The right to do the work and an inspection of the new pipe before it is buried. It is $90.00 on Reno's residential EZ list. It does not cover street opening where the line crosses public right of way.

Related guides

Sources