Furnace replacement: where the money goes

Swapping a furnace for one of the same type in the same spot is a short, predictable HVAC job plus the equipment; the bill grows when the venting, gas line or ductwork has to change. Permit lines for the swap are modest on the schedules we read: $89.00 in Reno, $91.00 in Portland under a $167.00 minimum, $290 in San Francisco. The median HVAC mechanic earns $29.33 an hour, which implies $49.90 to $60.18 per billed hour.

Same box, or a different kind of box

The cheapest furnace replacement is the boring one. The new unit matches the old one's fuel, airflow direction and venting type, slides into the same footprint and connects to ducts that were already the right size. The installer adapts the plenum, reconnects gas, power, thermostat wire and flue, runs the startup checks and leaves.

Change any of those and you have bought more than a furnace.

Labor arithmetic

HVAC mechanics, United States, May 2025 wages. Loaded cost adds 43.8% for benefits and required employer costs. The implied columns divide loaded cost by one minus a gross margin. Arithmetic on public averages, not a quote. For your own metro, open the HVAC mechanic pages.
National wage pointWage / hrLoaded / hrImplied billed hr, 15.5% marginImplied billed hr, 29.9% marginOne worker-day (8 hr) at 29.9%
25th percentile$23.25$33.44$39.56$47.71$382
Median$29.33$42.19$49.90$60.18$481
75th percentile$37.05$53.29$63.04$76.02$608

See HVAC mechanic wages for every metro.

Ask how many people and how many days. We have no public dataset of job durations, so put the question to the bidder. Whatever they answer, multiply worker-days by the column on the right and you have the labor share at a remodeler's margin.

Permit lines

Permit fee lines read from each city's published schedule in November 2026. Lines stack: an application or minimum fee usually sits under the item fee, and plan review, state surcharges and re-inspections come on top. Check your own city.
CityLine on the scheduleFeeSchedule
Reno, NVResidential EZ permit: furnace$89.00EZ Permits and Miscellaneous Fees, effective July 1, 2026
Reno, NVResidential EZ permit: furnace, oil to gas$133.00EZ Permits and Miscellaneous Fees, effective July 1, 2026
Portland, OROne and two family dwelling mechanical permit, minimum fee$167.00Mechanical Permit Fee Schedule, effective July 10, 2026
Portland, ORInstall or replace furnace or burner, including ductwork, vent and liner$91.00Mechanical Permit Fee Schedule, effective July 10, 2026
Grand Rapids, MIMechanical permit application, includes 1 inspection$52.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
Grand Rapids, MIMechanical, residential replacement: furnace$21.00Planning, Design and Development Fee Schedule, FY 2027, effective July 1, 2026
San Francisco, CACategory 1M, single residential unit: mechanical gas appliance (furnace, hydronic heat, heat pump), maximum two inspections$290Table 1A-C, Plumbing/Mechanical Issuance and Inspection Fees, effective July 12, 2026

Portland's own schedule says its furnace line includes ductwork, vent and liner. Grand Rapids separates the application fee from the equipment fee, so the two lines stack.

Equipment prices

Producer prices for the main materials on this job. Latest index level for each series, with the change over 12 months and since January 2020. Each row uses the latest month that has a year-earlier reading. (p) marks a preliminary PPI figure; BLS revises indexes for up to four months after first publication. Source: BLS.
SeriesBLS series IDMonthIndex12 monthsSince Jan 2020
Air conditioning and refrigeration equipmentWPU1148October 2026 (p)325.9+4.1%+62.1%
CPI-U, all items, U.S. city averageCUUR0000SA0September 2026336.9+3.7%+30.6%

Sorting the quotes

Each bid should name the model, the capacity and the efficiency rating, state what happens to the venting, list any duct changes, and say who pulls the permit. Be wary of a size picked by matching the old nameplate. Houses get insulated and re-windowed, and the old furnace may have been oversized on day one. A bidder who ran a load calculation has earned more trust than one who read a label.

Is the permit worth arguing about?

No. On every schedule we read it is a small fraction of one worker-day of labor, which at the national median implies about $481 at a remodeler's margin. The inspection that comes with it is a second set of eyes on a gas appliance.

Why would a furnace quote include work on the water heater?

Shared venting. If both appliances used one chimney and the new furnace vents through the wall, the water heater left behind may need a smaller liner to draft properly. It is a legitimate line, and it should be itemized.